Location Located at the corner of Golden Drive and Glacier Street in the Mayfair Industrial Park located at the west end of the Port Mann Bridge. Direct access is available to Lougheed Highway and the Trans-Canada Highway. Features Concrete tilt-up construction 20’ ceilings Grade level loading doors accessed from a loading court between buildings 120 & 130 Glacier 3-phase power Washrooms Test kitchen Dry aging cooler 980 SF blast freezer 3 parking stalls, EV charging port
Thank you for your request. A representative will be in contact with you within 48 hours.